Workshop Across the Field checkerboard floor corrugated iron panels weathered and
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 31 - Aug 5
Live Spec
Workshop Across the Field checkerboard floor corrugated iron panels weathered andThe main workshop building at Elrington Colliery, seen across the yard from the blacksmith shop side. The gantry crane structure rising above the roofline served a 15 tonne overhead electric crane inside. BHP Collieries operated the site from 1930 until December 1962, when the mine closed with large coal reserves still in the ground. Part of the Elrington Colliery series.
Store: selfdriverentaluganda.com · Domain: selfdriverentaluganda.com
























